The Weir, Castlecomer Road, Kilkenny
Completion of 45 executive types, traditional cavity wall construction, pre-cast concrete floors and completion of all site curtilage works including full fit-out and all internal finishes. McCarthy Bros. Building Contractors acted as Main Contractors and PSCS on this project, located close to Kilkenny City Centre. This mixed development consists of houses and apartments and was delivered on time and within budget to the satisfaction of the Client The ground floor apartments were designed for wheelchair access & internal alterations were made to cater for persons with special needs. The buildings were constructed with concrete block & concrete floors with a high level of finish internally.

Ayrfield, Kilkenny
Construction of 55 No. large executive type homes, including all main site development works, including the laying of 750 LM of surface water main from site to the river Breagagh, excavating through public roads etc. Construction of 630m3 attentuation tank on site and all associated works involved. This development was runner up in the LAMA finalist's Awards in 2008 for "Best Private Housing Development". This successful housing development included for seven Apartments to be constructed over 3 floors, and was located in a limited site infill. The apartments were all accessible from a common lobby area which included for a personnel lift and stairs. All apartments were catered to suit wheelchair requirements & needs.

Gallowshill, Kilkenny
Construction of 18 No private houses - Solid block construction, built on raft foundations, all main site development works including 120LM foul sewer pipe on main public road to connect to public sewer.

The Malthouse, Waterford
Construction of 41 no. apartments and 3 no. retail units, in two blocks of three and four storeys, over underground car park, constructed on raft and piled foundations at Mary Street, Waterford.